Here’s a copy of the draft Market Analysis prepared for the Sprague/Appleway plan by consultant ECONorthwest, dated August 31, 2006.
Market analysis (2.5 Mb, Acrobat® required)
Posted by Site Admin at 01:56 PM. Filed under: Plan Documents •
Here’s a copy of the draft Market Analysis prepared for the Sprague/Appleway plan by consultant ECONorthwest, dated August 31, 2006.
Market analysis (2.5 Mb, Acrobat® required)
Posted by Site Admin at 01:56 PM. Filed under: Plan Documents •
This links to a file containing the sketches presented at the September 14, 2006 presentation to the Spokane Valley Council and Planning Commission, illustrating what a new city center might look like if developed at the intersection of Sprague Avenue and University Street. Includes first floor and roof plan pages.
Conceptual sketches (320 Kb, Acrobat® file)
Posted by Site Admin at 05:21 PM. Filed under: Plan Documents •
This document presents an initial summary of existing plans, policies, and studies potentially important to developing the Sprague/Appleway corridor plan.
Policy summary (1.2 Mb, Acrobat® file)
Posted by Site Admin at 01:26 PM. Filed under: Plan Documents •
Here’s a map, including aerial imagery showing the boundaries of the corridor study area being considered in the Sprague/Appleway project. (Acrobat® required)
Posted by Site Admin at 04:03 PM. Filed under: Plan Documents •
In support of the City of Spokane Valley's new Comprehensive Plan, the Sprague/Appleway Revitalization project will engage residents in developing a strategic "blueprint" to help the corridor grow into a thriving commercial and residential district. Help shape the physical and economic future of the Valley...join the process!